The agent inferred auto-pull.sh had pulled alpha and fofos ahead of the rollout. It had not. alpha was rolled by hand by the session that cut the release, before being stopped; fofos was current because it had been deployed to all day for plugin work. The wrong reading is kept in the text rather than deleted — a real cron, on the right machine, with the right effect, and nothing to do with this. That is what a plausible wrong answer looks like.
deploy/
One file per release, and one report per release.
deploy/
├── 2026.08.21.01.md the plan — what to run, in order, on which hosts
└── 2026.08.21.01.report.md what actually happened, written by the commander
The plan is written by hand before the release commit. The report is written by the deploy commander afterwards and pushed back here.
A release is a tag, deploy/<version>, and nothing else triggers a deploy — not a commit message,
not a branch. A tag cannot be written into prose by accident, which a code word can and which every
document about deploying does.
What marks a release deployed is LOCAL: $OFFICER_ROOT/data/deploys/<version>.done. Not the report.
If the lock were the pushed report, a failed push would mean the release looked undeployed and the next
tick would roll it out again — and pushes here fail for unrelated reasons. So the report is an artefact,
valuable and not load-bearing.
See prompts/deploy-commander.md.